N.Y.C. Admin. Code § 27-628: § 27-628 Erection.
Where this section sits in the code
- New York City Administrative Code
- Title 27
- Chapter 1: Building Code
(a) Bracing. All framework shall be carried up true and plumb. Temporary bracing shall be provided to support all loads imposed upon the framework during construction that are in excess of those for which the framework was designed.
(b) Temporary connections. As erection progresses, the work shall be securely bolted, or welded, to resist all dead loads, wind, and erection stresses.
(c) Alignment. The structure shall be properly aligned before riveting, permanent bolting, or welding is performed.
Collected 2026-09-06T02:48:57Z. Source file · JSON