GroundRules
← Search the law
New York City · Through Local Law 2026/135 (enacted August 31, 2026)

N.Y.C. Admin. Code § 27-904: § 27-904 Establishing gas supply.

Read at publisher ↗
Where this section sits in the code
  1. New York City Administrative Code
  2. Title 27
  3. Chapter 1: Building Code

It shall be unlawful for any utility company to supply gas to a building, place or premises in which new meters other than replacement are required until a certificate of approval of gas installation from the department of buildings is filed with such utility company. When new gas service piping has been installed it shall be locked-off by the utility either by locking the gas service line valve or by installing a locking device on the outside gas service line valve. The lock shall not be removed until the gas meter piping (other than utility owned) and gas distribution piping has been inspected and certified as required by the department of buildings as being ready for service.

Collected 2026-09-06T02:48:57Z. Source file · JSON

Browse this collection