GroundRules
← Search the law
New York City · Through Local Law 2026/135 (enacted August 31, 2026)

N.Y.C. Admin. Code § FGC 415: Section FGC 415: Piping Support Intervals

Read at publisher ↗
Where this section sits in the code
  1. New York City Administrative Code
  2. Title 28
  3. Chapter 9: New York City Fuel Gas Code

415.1 Interval of support.

Piping shall be supported at intervals not exceeding the spacing specified in Table 415.1.

Table 415.1 Support of Piping

Steel Pipe, Nominal Size of Pipe (inches)

Spacing of Supports (feet)

1/2

6

3/4 or 1

8

1 1/4 or larger (horizontal)

12

All vertical piping

Every floor level

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.

Collected 2026-09-06T02:48:57Z. Source file · JSON

Browse this collection