GroundRules
← Search the law
Oregon · Through 2025 Edition

ORS 543A.135: Exceptions to final order.

Read at publisher ↗
Where this section sits in the code
  1. 15 - Water Resources, Agriculture and Food
  2. 45. Water Resources: Irrigation, Drainage, Flood Control, Reclamation
  3. Chapter 543A — Reauthorizing and Decommissioning Hydroelectric Project

(1) Within 20 days after the Water Resources Director issues a final order under ORS 543A.130 after the conclusion of a contested case hearing, any party may file exceptions to the order with the Water Resources Commission.

      (2) The commission shall issue a modified order, if the exceptions are allowed, or deny the exceptions within 60 days after the close of the exception period under subsection (1) of this section.

Collected 2026-09-03T23:50:15Z. Source file · JSON

Browse this collection