GroundRules
← Search the law
Pennsylvania · Through 2024-03-12 (Statute Update stamp, 58 Pa.C.S.)

58 Pa.C.S. § 3218.4: Corrosion control requirements.

Read at publisher ↗
Where this section sits in the code
  1. Title 58 - OIL AND GAS
  2. PART III UTILIZATION
  3. CHAPTER 32 DEVELOPMENT
  4. SUBCHAPTER B GENERAL REQUIREMENTS

(a) Pipelines.--All buried metallic pipelines shall be installed and placed in operation in accordance with 49 CFR Pt. 192 Subpt. I (relating to requirements for corrosion control).

(b) Tanks.--Permanent aboveground and underground tanks must comply with the applicable corrosion control requirements in the department's storage tank regulations.

(c) Other structures.--For all other buried metallic structures, including well casings, the Environmental Quality Board shall promulgate regulations setting forth methods of determining the need for corrosion protection and installing necessary corrosion protection.

(d) Procedures.--The corrosion control procedures under subsections (a) and (b) must be carried out by or under the direction of a person qualified in corrosion methods.

(e) Compliance.--An operator of a new, replaced, relocated or otherwise changed pipeline must be in compliance with the applicable requirements of this section by the date the pipeline goes into service.

Collected 2026-09-02T16:34:23Z. Source file · JSON

Browse this collection