R.I. Gen. Laws § 23-19.2-11: Percolation tests and ground water determinations.
Where this section sits in the code
- Title 23 Health and Safety
- Chapter 19.2 Local Health Regulations
Whenever a percolation test and/or ground water determination is required on any property within this state, the registered professional engineer or registered surveyor conducting the tests shall notify the city or town engineering department where the tests are to be taken, in writing, of the date and location of the tests, at least seven (7) days prior to the taking of the tests.
Collected 2026-09-05T19:56:52Z. Source file · JSON