S.C. Code Ann. § 40-11-530: Notice of claim; contents; request for clarification.
Where this section sits in the code
- Title 40 - PROFESSIONS AND OCCUPATIONS
- CHAPTER 11 Contractors
- ARTICLE 3 South Carolina Notice and Opportunity to Cure Nonresidential Construction Defects Act
(A) The claimant must serve a written notice of claim on the contractor, subcontractor, supplier, or design professional. The notice of claim must contain the following:
(1) a statement that the claimant asserts a construction defect;
(2) a description of the claim or claims in reasonable detail sufficient to determine the general nature of the construction defect; and
(3) a description of the results of the defect, if known.
(B) The contractor, subcontractor, supplier, or design professional must advise the claimant, within fifteen days of receipt of the claim, if the description of the claim or claims is not sufficiently stated and shall request clarification.
Collected 2026-09-02T07:20:39Z. Source file · JSON