S.C. Code Ann. § 40-59-840: Notice of claim; timing; contents; request for clarification.
Where this section sits in the code
- Title 40 - PROFESSIONS AND OCCUPATIONS
- CHAPTER 59 Residential Home Builders
- ARTICLE 5 South Carolina Notice and Opportunity to Cure Construction Dwelling Defects Act
(A) In an action brought against a contractor or subcontractor arising out of the construction of a dwelling, the claimant must, no later than ninety days before filing the action, serve a written notice of claim on the contractor. The notice of claim must contain the following:
(1) a statement that the claimant asserts a construction defect;
(2) a description of the claim or claims in reasonable detail sufficient to determine the general nature of the construction defect; and
(3) a description of any results of the defect, if known.
The contractor or subcontractor shall advise the claimant within fifteen days of receipt of the claim if the construction defect is not sufficiently stated and shall request clarification.