SDCL § 38-8A-18: Violation of adopted standards by land-disturbing activities--Control plan required--District approval--Implementation of plan.
Where this section sits in the code
- TITLE 38. AGRICULTURE AND HORTICULTURE
- CHAPTER 38-8A. SOIL EROSION AND SEDIMENT DAMAGE CONTROL
Upon the determination by the conservation district, pursuant to § 38-8A-20, that a land-disturbing activity is violating adopted standards, the land disturber shall be required to prepare an erosion and sediment control plan within six months, and have the plan approved by the local conservation district. Upon approval of the plan by the conservation district, the land disturber shall be allowed six months to implement the plan.
Collected 2026-09-03T15:18:57Z. Source file · JSON