SDCL § 43-13-24: Large wind energy system set back requirement--Exception.
Where this section sits in the code
- TITLE 43. PROPERTY
- CHAPTER 43-13. EASEMENTS AND SERVITUDES
Each wind turbine tower of a large wind energy system shall be set back at least five hundred feet or 1.1 times the height of the tower, whichever distance is greater, from any surrounding property line. However, if the owner of the wind turbine tower has a written agreement with an adjacent land owner allowing the placement of the tower closer to the property line, the tower may be placed closer to the property line shared with that adjacent land owner.