SDCL § 45-6C-20: Criteria for determining amount of surety.
Where this section sits in the code
- TITLE 45. MINING, OIL AND GAS
- CHAPTER 45-6C. MINERAL EXPLORATION
Criteria which shall be considered to determine the amount of surety necessary to guarantee the costs of reclamation of affected public and private lands and facilities include:
(1) Potential damages to unique and natural historical sites, springs, natural or man-made water storage and transport facilities, domestic and public water wells and water supply, waste water transport, storage and treatment facilities, or crops;
(2) Topography;
(3) Climatic, soil, and vegetative conditions;
(4) Estimated costs per test hole site to reclaim disturbed surface areas; and
(5) Estimated cost per test hole site to plug each test hole.
Collected 2026-09-03T15:18:57Z. Source file · JSON