GroundRules
← Search the law
South Dakota · Through 2026-08-31 · Newer source version available

SDCL § 45-6D-20: Criteria for determining amount of surety.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 45. MINING, OIL AND GAS
  2. CHAPTER 45-6D. URANIUM EXPLORATION

Criteria which shall be considered to determine the amount of surety necessary to guarantee the costs of reclamation of affected public and private lands and facilities include:

(1) Potential damages to unique and natural historical sites, springs, natural or man made water storage and transport facilities, domestic and public water wells and water supply, waste water transport, storage and treatment facilities or crops;

(2) Topography;

(3) Climatic, soil, and vegetative conditions;

(4) Estimated costs per test hole site to reclaim disturbed surface areas; and

(5) Estimated cost per test hole site to plug each test hole.

Collected 2026-09-03T15:18:57Z. Source file · JSON

Browse this collection