GroundRules
← Search the law
South Dakota · Through 2026-08-31 · Newer source version available

SDCL § 46-6-11: Records of well construction required.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 46. WATER RIGHTS
  2. CHAPTER 46-6. GROUNDWATER AND WELLS

On each well drilled the driller shall keep accurate records and complete a record of well construction on a form supplied by the chief engineer. If for any reason well construction is begun but not completed, the well driller shall complete the record of well construction to the extent possible. Within one month of completion of a well driller's work on a well, the well driller shall file all well construction records with the chief engineer for placement on permanent file. Access to the records is available to the public at any time during normal business hours.

Collected 2026-09-03T15:18:57Z. Source file · JSON

Browse this collection