GroundRules
← Search the law
South Dakota · Through 2026-08-31 · Newer source version available

SDCL § 49-16A-59: Filing as vesting right to use--Duration of right--Forfeiture for failure to use.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 49. PUBLIC UTILITIES AND CARRIERS
  2. CHAPTER 49-16A. INTRASTATE RAILROAD REGULATION

The filing with the commissioner of school and public lands of the map required by § 49-16A-58 authorizes the railroad, for one year from the filing date, to enter upon the land so surveyed and selected and construct a road thereon. If the railroad does not construct its road across the land within one year after the filing of the map, it forfeits all rights acquired by the filing of the map.

Collected 2026-09-03T15:18:57Z. Source file · JSON

Browse this collection