GroundRules
← Search the law
Tennessee · Snapshot open-us-law v2026.08, retrieved 2026-09-17

Tenn. Code Ann. § 64-1-608: Advisory board

Read at publisher ↗
Where this section sits in the code
  1. TN Code
  2. Title 64
  3. Chapter 1

(a) There is established the Tennessee Duck River agency technical advisory committee. Members of the committee serve as members of the board of directors and as the technical advisory committee to the board. (b) The technical advisory committee is composed of one (1) member from each water system, to be appointed by the governing body of the water system. (c) For purposes of voting, the vote of each technical advisory committee member must be weighted based on the following formula: Amount of finished water pumped to system pursuant to § 64-1-605(d) by the water system from the Upper Duck River watershed in the previous fiscal year Member's Eligible DRATAC Votes = 100 x ______________ Total amount of finished water pumped to system pursuant to § 64-1-605(d) by all water systems from the Upper Duck River watershed in the previous fiscal year (d) Before an agency regional water supply program or project is approved, the program or project must receive sixty percent (60%) of the technical advisory committee's votes. (e) A member of the technical advisory committee serves at the pleasure of the water system that appointed the member. Amended by 2024 Tenn. Acts, ch. 927,s 5, eff. 7/1/2024. Acts 1965, ch. 80, § 8; T.C.A., § 66-1-608.

(a) There is established the Tennessee Duck River agency technical advisory committee. Members of the committee serve as members of the board of directors and as the technical advisory committee to the board.

(b) The technical advisory committee is composed of one (1) member from each water system, to be appointed by the governing body of the water system.

(c) For purposes of voting, the vote of each technical advisory committee member must be weighted based on the following formula: Amount of finished water pumped to system pursuant to § 64-1-605(d) by the water system from the Upper Duck River watershed in the previous fiscal year Member's Eligible DRATAC Votes = 100 x ______________ Total amount of finished water pumped to system pursuant to § 64-1-605(d) by all water systems from the Upper Duck River watershed in the previous fiscal year

Amount of finished water pumped to system pursuant to § 64-1-605(d) by the water system from the Upper Duck River watershed in the previous fiscal year Member's Eligible DRATAC Votes = 100 x ______________ Total amount of finished water pumped to system pursuant to § 64-1-605(d) by all water systems from the Upper Duck River watershed in the previous fiscal year

Amount of finished water pumped to system pursuant to § 64-1-605(d) by the water system from the Upper Duck River watershed in the previous fiscal year

Member's Eligible DRATAC Votes = 100 x ______________

Total amount of finished water pumped to system pursuant to § 64-1-605(d) by all water systems from the Upper Duck River watershed in the previous fiscal year

(d) Before an agency regional water supply program or project is approved, the program or project must receive sixty percent (60%) of the technical advisory committee's votes.

(e) A member of the technical advisory committee serves at the pleasure of the water system that appointed the member.

Collected 2026-09-17T21:51:56Z. Source file · JSON

Compilation CC BY 4.0, Open US Law (Vaquill AI). GroundRules uses only the releases published under CC BY 4.0: from v2026.09 the compilation is licensed CC BY-NC 4.0, and GroundRules does not use those releases. Each affected row names its release in its vintage label. GroundRules parsed and filtered the compilation to retain enacted text. Source · License

Tennessee electronic product files were republished by Public.Resource.Org under a public-domain mark. GroundRules uses enacted text from Release 76 only as a labeled supplement to the newer Open US Law rows. Source

Browse this collection