GroundRules
← Search the law
Texas · Through 89th 2nd Called Legislative Session, 2025

Tex. Transportation Code § 228.207: CÉSAR CHÁVEZ FREEWAY.

Read at publisher ↗
Where this section sits in the code
  1. TRANSPORTATION CODE
  2. TITLE 6. ROADWAYS
  3. SUBTITLE B. STATE HIGHWAY SYSTEM
  4. CHAPTER 228. STATE HIGHWAY TOLL PROJECTS
  5. SUBCHAPTER E. LIMITATION ON TOLL FACILITY DESIGNATION; CONVERSION OF NONTOLLED STATE HIGHWAY

(a) In this section, "César Chávez Freeway" means the portion of Loop 375 in El Paso County between Interstate Highway 10 and Santa Fe Street.

(b) If the Camino Real Regional Mobility Authority approves the conversion of the portion of the César Chávez Freeway that is operated as a toll project to a nontolled project:

(1) any money advanced by the department to the authority for the construction or maintenance of a toll project on the César Chávez Freeway that is unexpended on the effective date of the conversion shall be used for the construction of the Loop 375 Border Highway West Project in El Paso County from Race Track Drive to U.S. Highway 54 and added to the authority's obligation for that project under terms agreeable to the department; and

(2) the department shall maintain the César Chávez Freeway as part of the state highway system without tolls.

Added by Acts 2017, 85th Leg., R.S., Ch. 533 (S.B. 312), Sec. 38, eff. September 1, 2017.

Collected 2026-08-27T01:47:44Z. Source file · JSON

Browse this collection