GroundRules
← Search the law
Utah · Through 2026 General Session

Utah Code § 54-17-202: Requirements for solicitation.

Read at publisher ↗
Where this section sits in the code
  1. Title 54 Public Utilities
  2. Chapter 54-17 Energy Resource Procurement Act
  3. Part 54-17-2 Solicitation Process

(1) The commission shall make rules, in accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, outlining the requirements for a solicitation process. The rules required by this Subsection (1) shall include:

(a) the type of screening criteria an affected electrical utility may use in a solicitation process including the risks an affected electrical utility may consider;

(b) the required disclosures by an affected electrical utility if a solicitation includes a benchmark option;

(c) the required disclosures by an affected electrical utility related to the methodology the affected electrical utility uses to evaluate bids; and

(d) the participation of an independent evaluator in a manner consistent with Section 54-17-203.

(2) If an affected electrical utility is subject to regulation in more than one state regarding the acquisition, construction, or cost recovery of a significant energy resource, in making the rules required by Subsection (1), the commission may consider the impact of the multistate regulation including requirements imposed by other states as to:

(a) the solicitation process;

(b) cost recovery of resources; and

(c) methods by which the affected electrical utility may be able to mitigate the potential for cost disallowances.

Collected 2026-09-03T11:34:33Z. Source file · JSON

Browse this collection