GroundRules
← Search the law
Utah · Through 2026 General Session

Utah Code § 54-21-303: Exceptions to permitting.

Read at publisher ↗
Where this section sits in the code
  1. Title 54 Public Utilities
  2. Chapter 54-21 Small Wireless Facilities Deployment Act
  3. Part 54-21-3 Permitting Process for Small Wireless Facilities

(1) Except as provided in Subsection (2), an authority may not require a wireless provider to submit an application, obtain a permit, or pay a rate for:

(a) routine maintenance;

(b) the replacement of a small wireless facility with a small wireless facility that is substantially similar or smaller in size; or

(c) the installation, placement, maintenance, operation, or replacement of a micro wireless facility that is strung on a cable between existing utility poles, in compliance with the National Electrical Safety Code.

(2)

(a) An authority may require a wireless provider to obtain a permit in accordance with Section 72-7-102 for work that requires excavation or closing of sidewalks or vehicular lanes in a public right-of-way.

(b) If an authority requires a permit under Subsection (2)(a), the authority shall process and approve the permit within the same time period the authority processes and approves a permit for all other types of entities.

(3)

(a) An authority may require advance notice of an activity described in Subsection (1).

(b) A wireless provider may replace or upgrade a utility pole only with the approval of the utility pole's owner.

Collected 2026-09-03T11:34:33Z. Source file · JSON

Browse this collection