GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

12VAC5-590-975: Removal of radionuclides

Read at publisher ↗
Where this section sits in the code
  1. Title 12. Health
  2. Agency 5. Department of Health
  3. Chapter 590. Waterworks Regulations
  4. Part III. Manual of Practice for Waterworks Design
  5. Article 3. Processes and Devices [Repealed]

A. Processes for the removal of radionuclides specified as BAT are identified in 40 CFR 141.66. The specific process and equipment proposed for removal of radionuclides shall to the satisfaction of the department have a demonstrated history of successful performance with similar water quality characteristics and performance requirements. Otherwise, the procedures of 12VAC5-590-290 shall apply.

B. When manganese greensand filter systems are utilized, the design shall meet the requirements of 12VAC5-590-920 B. In addition, a chemical contact tank with a minimum detention time of 30 minutes shall be provided. Laboratory or pilot studies may be required to demonstrate compliance with the radium standard when using a filtering treatment system for groundwater with total radium greater than 10 pCi/L.

C. Waste handling, disposal, and permitting shall be given special consideration early in the design process.

D. Occupational exposure shall be considered in the project design.

E. Provisions for operational control monitoring of the radionuclides requiring removal or of acceptable surrogates shall be included in the project design.

Collected 2026-09-14T04:50:42Z. Source file · JSON

Browse this collection