12VAC5-630-430: Disinfection
Where this section sits in the code
- Title 12. Health
- Agency 5. Department of Health
- Chapter 630. Private Well Regulations
- Part III. Design and Construction Criteria
- Article 2. General Provisions
A. Private wells shall be disinfected before placing the well in service.
B. Methodology. Disinfection shall be accomplished by one of the following methods:
1. Maintaining a 100 mg/l solution of chlorine in the well for 24 hours utilizing the dosage rates set forth in 12VAC5-630-470.
2. Applying a quantity of water/chlorine solution to ensure a minimum of 100 mg/L of available chlorine throughout the well and immediate formation materials. Disinfection contact time shall be established on the basis of contact units, which are calculated as mg/L chlorine multiplied by hours of exposure. Contact time shall equate to a minimum of 1,000 contact units (50 mg/L chlorine x 20 hours = 1,000 contact units; 200 mg/L chlorine x 5 hours = 1,000 contact units; etc.).
Collected 2026-09-14T04:50:48Z. Source file · JSON