16VAC25-50-130: Defective conditions disclosed at time of external inspection
Where this section sits in the code
- Title 16. Labor And Employment
- Agency 25. Safety And Health Codes Board
- Chapter 50. Boiler and Pressure Vessel Regulations
- Part II. Administration
If, upon an external inspection, there is evidence of a leak or crack, sufficient covering of the boiler or pressure vessel shall be removed to permit the inspector to satisfactorily determine the safety of the boiler or pressure vessel. If the covering cannot be removed at that time, the inspector may order the operation of the boiler or pressure vessel stopped until the covering can be removed and proper examination made.
Collected 2026-09-14T04:52:08Z. Source file · JSON