16VAC25-50-510: Clearance

Read at publisher ↗
Where this section sits in the code
  1. Title 16. Labor And Employment
  2. Agency 25. Safety And Health Codes Board
  3. Chapter 50. Boiler and Pressure Vessel Regulations
  4. Part IV. General Requirements

When boilers are replaced or new boilers are installed in either existing or new buildings, a minimum clearance of two feet on all service sides shall be provided. Boilers and pressure vessels having manholes shall have five feet clearance from the manhole opening and any wall, ceiling or piping that will prevent a person from entering the boiler or vessel. All boilers and pressure vessels shall be located so that adequate space will be provided for the proper operation of the boilers and pressure vessels and their appurtenances, for the inspection of all surfaces, tubes, waterwalls, economizers, piping, valves and other equipment, and for their necessary maintenance and repair and replacement of tubes.

Collected 2026-09-14T04:52:08Z. Source file · JSON

Browse this collection