GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

4VAC20-360-70: Specific siting guidelines

Read at publisher ↗
Where this section sits in the code
  1. Title 4. Conservation And Natural Resources
  2. Agency 20. Marine Resources Commission
  3. Chapter 360. Criteria for the Siting of Marinas or Community Facilities for Boat Mooring

A. For community piers and marina facilities which are appurtenances to residential developments, the number of slips will not necessarily be predicated by the number of units on the property.

B. The dredging of access channels should be limited to the minimum dimensions necessary for navigation and should avoid sensitive areas such as wetlands, shellfish grounds and seagrass beds.

C. Dredged material disposal areas for initial as well as future disposal needs should be clearly defined and designated.

D. Dredged areas should be no more than one foot deeper than controlling depths in the waterway and should be connected to natural channels of similar depth.

E. Piers and wharves crossing vegetated wetland and seagrass areas should be limited to the minimum necessary for water access.

F. Where vegetated areas are crossed, the height of the pier above the substrate should be equal to one foot less than its width with a three foot minimum required.

G. Site specific stormwater management BMP's are required (such as buffer strips, grassed swales, wet detention ponds and permeable parking surfaces).

H. A solid waste disposal and recovery plan with facilitated marina user access shall accompany marina development plans.

I. Sanitary facilities and pumpout facilities convenient to marina users should accompany development plans.

J. All fuel facilities shall incorporate automatic shutoff valves and shall have spill contingency plans.

K. Methods of insuring against the discharge of wastes, gray water, fuels, bilge wastes and the use of TBT paints shall be provided.

L. Facilities incorporating boat maintenance operations shall include plans for the efficient collection and removal of sand blasting material, paint chips and other by-products of maintenance operations.

Collected 2026-09-14T04:45:33Z. Source file · JSON

Browse this collection