GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

4VAC25-130-784.25: Return of coal processing waste to abandoned underground workings

Read at publisher ↗
Where this section sits in the code
  1. Title 4. Conservation And Natural Resources
  2. Agency 25. Department of Energy
  3. Chapter 130. Coal Surface Mining Reclamation Regulations
  4. Part 784. Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan

(a) Each plan shall describe the design, operation and maintenance of any proposed coal processing waste disposal facility, including flow diagrams and any other necessary drawings and maps, for the approval of the division and the Mine Safety and Health Administration under 4VAC25-130-817.81(f).

(b) Each plan shall describe the source and quality of waste to be stowed, area to be backfilled, percent of the mine void to be filled, method of constructing underground retaining walls, influence of the backfilling operation on active underground mine operations, surface area to be supported by the backfill, and the anticipated occurrence of surface effects following backfilling.

(c) The applicant shall describe the source of the hydraulic transport mediums, method of dewatering the placed backfill, retainment of water underground, treatment of water if released to surface streams, and the effect on the hydrologic regime.

(d) The plan shall describe each permanent monitoring well to be located in the backfilled area, the stratum underlying the mined coal, and gradient from the backfilled area.

(e) The requirements of Paragraphs (a), (b), (c), and (d) of this section shall also apply to pneumatic backfilling operations, except where the operations are exempted by the division from requirements specifying hydrologic monitoring.

Collected 2026-09-14T04:46:16Z. Source file · JSON

Browse this collection