GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

4VAC25-130-827.12: Coal preparation plants; performance standards

Read at publisher ↗
Where this section sits in the code
  1. Title 4. Conservation And Natural Resources
  2. Agency 25. Department of Energy
  3. Chapter 130. Coal Surface Mining Reclamation Regulations
  4. Part 827. Permanent Program Performance Standards—Coal Preparation Plants Not Located Within the Permit Area of a Mine

Construction, operation, maintenance, modification, reclamation, and removal activities at coal preparation plants shall comply with the following:

(a) Signs and markers for the coal preparation plant, coal processing waste disposal area, and water-treatment facilities shall comply with 4VAC25-130-816.11.

(b) Any stream channel diversion shall comply with 4VAC25-130-816.43.

(c) Drainage from any disturbed area related to the coal preparation plant shall comply with 4VAC25-130-816.45 through 4VAC25-130-816.47, and all discharges from these areas shall meet the requirements of 4VAC25-130-816.41 and 4VAC25-130-816.42 and any other applicable State or Federal law.

(d) Permanent impoundments associated with coal preparation plants shall meet the requirements of 4VAC25-130-816.49 and 4VAC25-130-816.56. Dams constructed of, or impounding, coal processing waste shall comply with 4VAC25-130-816.84.

(e) Disposal of coal processing waste, noncoal mine waste, and excess spoil shall comply with 4VAC25-130-816.81, 4VAC25-130-816.83, 4VAC25-130-816.84, 4VAC25-130-816.87, 4VAC25-130-816.89, and 4VAC25-130-816.71 through 4VAC25-130-816.75, respectively.

(f) Fish, wildlife, and related environmental values shall be protected in accordance with 4VAC25-130-816.97.

(g) Support facilities related to the coal preparation plant shall comply with 4VAC25-130-816.181.

(h) Roads shall comply with 4VAC25-130-816.150 through 4VAC25-130-816.152.

(i) Cessation of operations shall be in accordance with 4VAC25-130-816.131 and 4VAC25-130-816.132.

(j) Erosion and air pollution attendant to erosion shall be controlled in accordance with 4VAC25-130-816.95.

(k) Adverse effects upon, or resulting from, nearby underground coal mining activities shall be minimized by appropriate measures including, but not limited to, compliance with 4VAC25-130-816.79.

(l) Reclamation shall follow proper topsoil handling, backfilling and grading, revegetation, and postmining land use procedures in accordance with 4VAC25-130-816.22, 4VAC25-130-816.100, 4VAC25-130-816.102, 4VAC25-130-816.104, 4VAC25-130-816.106, 4VAC25-130-816.111, 4VAC25-130-816.113, 4VAC25-130-816.114, 4VAC25-130-816.116, and 4VAC25-130-816.133, respectively.

Collected 2026-09-14T04:46:20Z. Source file · JSON

Browse this collection