GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

4VAC25-130-840.12: Right of entry

Read at publisher ↗
Where this section sits in the code
  1. Title 4. Conservation And Natural Resources
  2. Agency 25. Department of Energy
  3. Chapter 130. Coal Surface Mining Reclamation Regulations
  4. Part 840. Inspection and Enforcement—General

(a) Representatives of the Director are authorized to enter upon and through any coal exploration or surface coal mining and reclamation operation without advance notice upon presentation of appropriate credentials. No search warrant shall be required, except that entry into buildings shall be conducted only upon consent of the permittee or by search warrant.

(b) Representatives of the Director are authorized to inspect any monitoring equipment or method of exploration or operation, and to have access to and copy any records required under the Act or this chapter. Representatives of the Director may exercise these rights at reasonable times, without advance notice, upon presentation of appropriate credentials. No search warrant shall be required, except that entry into buildings shall be conducted only upon consent of the permittee or by search warrant.

Collected 2026-09-14T04:46:20Z. Source file · JSON

Browse this collection