GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

4VAC25-31-410: Storage of top soil

Read at publisher ↗
Where this section sits in the code
  1. Title 4. Conservation And Natural Resources
  2. Agency 25. Department of Energy
  3. Chapter 31. Reclamation Regulations for Mineral Mining
  4. Part IV. Performance Standards
  5. Article 2. Permit Renewal and Surety Adjustments

A. Top soil required for reclamation shall be stored with a maximum slope of 2:1 and in such a manner as to remain available for reclamation. The operator shall retain a minimum quantity sufficient to cover all disturbed areas to be reclaimed with six inches of top soil or as specified in an approved operations plan. Top soil will be needed for future reclamation and shall not be removed from the permitted area unless authorized by the division.

B. The stockpiled top soil shall be seeded with quick growing grasses or legumes for stabilization until used in final reclamation.

C. The provisions of this section shall not apply to sand and gravel operations in the Coastal Plain physiographic province.

Collected 2026-09-14T04:45:51Z. Source file · JSON

Browse this collection