9VAC20-81-475: Part B permit application requirements for CCR surface impoundments
Where this section sits in the code
- Title 9. Environment
- Agency 20. Virginia Waste Management Board
- Chapter 81. Solid Waste Management Regulations
- Part V. Permitting of Solid Waste Management Facilities
A. Part B permit application requirements for CCR surface impoundments regulated under Part VIII (9VAC20-81-800 et seq.) of this chapter are contained in this section. The Part B applications shall include the requirements and documentation described in this section.
B. A detailed design plan shall be prepared and submitted that describes how the CCR surface impoundment meets the design criteria found in 40 CFR 257.71 (existing CCR surface impoundments), 40 CFR 257.72 (new or lateral expansions of CCR surface impoundments), 40 CFR 257.73 (existing CCR surface impoundments), 40 CFR 257.74 (new or lateral expansions of CCR surface impoundments), as applicable.
C. An operating plan meeting the requirements of 40 CFR 257.80, 40 CFR 257.82, and 40 CFR 257.83 shall be prepared and submitted.
D. A site groundwater monitoring plan shall be prepared and submitted that meets the requirements of 40 CFR 257.90, 40 CFR 257.91, 40 CFR 257.93, 40 CFR 257.94, 40 CFR 257.95, 40 CFR 257.96, 40 CFR 257.97, and 40 CFR 257.98.
E. A detailed closure plan and post-closure plan meeting the requirements found in 40 CFR 257.101, 40 CFR 257.102, 40 CFR 257.103, 40 CFR 257.104 shall be prepared and submitted.
Collected 2026-09-14T04:48:59Z. Source file · JSON