9VAC25-32-357: Operational standards, pathogens, and vector attraction reduction
Where this section sits in the code
- Title 9. Environment
- Agency 25. State Water Control Board
- Chapter 32. Virginia Pollution Abatement (VPA) Permit Regulation
- Part IX. Biosolids Program
- Article 2. Operational and Monitoring Requirements
A. Biosolids shall be monitored to verify that the selected pathogen reduction treatment classification and vector attraction reduction method requirements have been met.
B. Pathogens – biosolids.
1. The Class A pathogen requirements in 9VAC25-32-675 A or the Class B pathogen requirements and site restrictions in 9VAC25-32-675 B shall be met when bulk biosolids is applied to agricultural land, forest, a public contact site, or a reclamation site.
2. The Class A pathogen requirements in 9VAC25-32-675 A shall be met when bulk biosolids is applied to a lawn or a home garden.
3. The Class A pathogen requirements in 9VAC25-32-675 A shall be met when biosolids is sold or given away in a bag or other container for application to the land.
C. Pathogens – domestic septage. The requirements in 9VAC25-32-675 C shall be met when domestic septage is applied to agricultural land, forest, or a reclamation site.
D. Vector attraction reduction – biosolids.
1. One of the vector attraction reduction requirements in 9VAC25-32-685 B 1 through B 10 shall be met when bulk biosolids is applied to agricultural land, forest, a public contact site, or a reclamation site.
2. One of the vector attraction reduction requirements in 9VAC25-32-685 B 1 through B 8 shall be met when bulk biosolids is applied to a lawn or a home garden.
3. One of the vector attraction reduction requirements in 9VAC25-32-685 B 1 through B 8 shall be met when biosolids is sold or given away in a bag or other container for application to the land.
E. Vector attraction reduction – domestic septage. The vector attraction reduction requirements in 9VAC25-32-685 B 9, B 10, or B 12 shall be met when domestic septage is applied to agricultural land, forest, or a reclamation site.
F. Additional operational control information may be required on an individual basis by the department.
Collected 2026-09-14T04:49:08Z. Source file · JSON