GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

9VAC25-32-480: Groundwater monitoring and reporting

Read at publisher ↗
Where this section sits in the code
  1. Title 9. Environment
  2. Agency 25. State Water Control Board
  3. Chapter 32. Virginia Pollution Abatement (VPA) Permit Regulation
  4. Part IX. Biosolids Program
  5. Article 2. Operational and Monitoring Requirements

A. Monitoring wells may be required by the department for land treatment sites, sludge lagoons, biosolids land application sites, or biosolids storage facilities to monitor groundwater quality.

B. If groundwater monitoring is required, a groundwater monitoring plan shall be submitted to the department for approval that includes at a minimum:

1. Geologic and hydrologic conditions at the site;

2. Monitoring well design, placement, and construction;

3. Sampling frequency;

4. Sampling procedures, including quality assurance and quality control; and

5. Collection of background samples.

Collected 2026-09-14T04:49:08Z. Source file · JSON

Browse this collection