9VAC25-875-1050: Duration of permits
Where this section sits in the code
- Title 9. Environment
- Agency 25. State Water Control Board
- Chapter 875. Virginia Erosion and Stormwater Management Regulation
- Part VII. Virginia Pollutant Discharge Elimination System (VPDES) Permits
- Article 4. Permit Conditions
A. Permits shall be effective for a fixed term not to exceed five years.
B. Except as provided in 9VAC25-875-890, the term of a permit shall not be extended by modification beyond the maximum duration specified in this section.
C. The department may issue any permit for a duration that is less than the full allowable term under this section.
D. A permit may be issued to expire on or after the statutory deadline set forth in § 301(b)(2)(A), (C), and (E) of the CWA, if the permit includes effluent limitations to meet the requirements of § 301(b)(2)(A), (C), (D), (E), and (F) of the CWA, whether or not applicable effluent limitations guidelines have been promulgated or approved.
Collected 2026-09-14T04:49:29Z. Source file · JSON