GroundRules
← Search the law
Virginia regulations · Through 2026 Regular Session (effective July 1, 2026)

9VAC5-530-160: Monitoring requirements

Read at publisher ↗
Where this section sits in the code
  1. Title 9. Environment
  2. Agency 5. State Air Pollution Control Board
  3. Chapter 530. Electric Generator Voluntary Demand Response General Permit
  4. Part IV. General Permit Terms and Conditions for an Affected Unit Using Fuel Throughput for Compliance Demonstration

A. The owner shall install and use a fuel flow meter to monitor the fuel throughput for each affected unit, calculated monthly as the sum of each consecutive 12-month period.

B. Each fuel flow meter shall be installed, maintained, calibrated, and operated in accordance with approved procedures which shall include, as a minimum, the manufacturer's written requirements or recommendations.

C. The fuel flow meter used to continuously measure the fuel throughput for each affected unit shall be observed by the owner with a frequency of not less than once per month. The owner shall keep a log of the observations from the fuel flow meter.

Collected 2026-09-14T04:48:49Z. Source file · JSON

Browse this collection