GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 19.122.050: Damage to underground facility—Notification by excavator—Repairs or relocation of facility.

Read at publisher ↗
Where this section sits in the code
  1. Title 19
  2. Chapter 19.122

(1) An excavator who, in the course of excavation, contacts or damages an underground facility shall notify the facility operator directly, if the facility operator is known, and a one-number locator service, and report the damage as required under RCW 19.122.053. If the damage causes an emergency condition, the excavator causing the damage shall also call 911 to alert the appropriate local public safety agencies and take all appropriate steps to ensure the public safety. No damaged underground facility may be buried until it is repaired or relocated.

(2) A facility operator notified in accordance with subsection (1) of this section shall arrange for repairs or relocation as soon as is practical, or permit the excavator to do necessary repairs or relocation at a mutually acceptable price.

Collected 2026-09-06T01:29:24Z. Source file · JSON

Browse this collection