GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 35.22.705: Purchase of electric power and energy from joint operating agency.

Read at publisher ↗
Where this section sits in the code
  1. Title 35
  2. Chapter 35.22

A city of the first class may contract to purchase from a joint operating agency electric power and energy required for its present or future requirements. For projects the output of which is limited to qualified alternative energy resources as defined by RCW 19.29A.090(3), the contract may include the purchase of capability of the projects to produce electricity in addition to the actual output of the projects. The contract may provide that the city must make the payments required by the contract whether or not a project is completed, operable, or operating and notwithstanding the suspension, interruption, interference, reduction, or curtailment of the output of a project or the power and energy contracted for. The contract may also provide that payments under the contract are not subject to reduction, whether by offset or otherwise, and shall not be conditioned upon the performance or nonperformance of the joint operating agency or a city, town, or public utility district under the contract or other instrument.

Collected 2026-09-06T02:08:26Z. Source file · JSON

Browse this collection