GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 47.56.120: Toll bridges—Construction directed—Costs.

Read at publisher ↗
Where this section sits in the code
  1. Title 47
  2. Chapter 47.56

In the event that any toll bridge should be constructed, all cost thereof including right-of-way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.

Collected 2026-09-06T03:07:47Z. Source file · JSON

Browse this collection