GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 68.24.180: Opening of roads, railroads through cemetery—Consent required.

Read at publisher ↗
Where this section sits in the code
  1. Title 68
  2. Chapter 68.24

After dedication under this title, and as long as the property remains dedicated to cemetery purposes, a railroad, street, road, alley, pipe line, pole line, or other public thoroughfare or utility shall not be laid out, through, over, or across any part of it without the consent of the cemetery authority or of not less than two-thirds of the owners of plots or rights of interment.

Collected 2026-09-06T03:34:29Z. Source file · JSON

Browse this collection