GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 70A.310.040: Facility operations and decommissioning—Monitoring.

Read at publisher ↗
Where this section sits in the code
  1. Title 70A
  2. Chapter 70A.310

The secretary or his or her representative shall monitor the operations of the mill for compliance with the conditions of the license by the owner or operator. The mill owner or operator shall be responsible for compliance, both during the lifetime of the facility and at shutdown, including but not limited to such requirements as fencing and posting the site; contouring, covering, and stabilizing the pile; and for decommissioning the facility.

Collected 2026-09-06T04:00:43Z. Source file · JSON

Browse this collection