GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 77.100.120: Cedar river spawning channel—Specifications.

Read at publisher ↗
Where this section sits in the code
  1. Title 77
  2. Chapter 77.100

The channel shall be designed to produce, at a minimum, fry comparable in quality to those produced in the Cedar river and equal in number to what could be produced naturally by the estimated two hundred sixty-two thousand adults that could have spawned upstream of the Landsburg diversion. Construction of the spawning channel shall commence no later than September 1, 1990. Initial construction size shall be adequate to produce fifty percent or more of the production goal specified in this section.

Collected 2026-09-06T04:16:14Z. Source file · JSON

Browse this collection