Wis. Stat. § 145.195: Building on unsewered property.
Where this section sits in the code
- Chs. 145-160, Public Health
- Chapter 145 Plumbing And Fire Protection Systems And Swimming Pool Plan Review
(1) No county, city, town or village may issue a building permit for construction of any structure requiring connection to a private on-site wastewater treatment system unless a private on-site wastewater treatment system satisfying all applicable regulations already exists to serve the proposed structure or all permits necessary to install a private on-site wastewater treatment system have been obtained.
(2) Before issuing a building permit for construction of any structure on property not served by a municipal sewage treatment plant, the county, city, town or village shall determine that the proposed construction does not interfere with a functioning private on-site wastewater treatment system. The county, city, town or village may require building permit applicants to submit a detailed plan of the owner’s existing private on-site wastewater treatment system.
Collected 2026-09-05T12:00:57Z. Source file · JSON