GroundRules
← Search the law
Wisconsin · Through 2023-24 Wisconsin Statutes updated through 2025 Wis. Act 247 (published 9-4-26)

Wis. Stat. § 87.03: Petition for flood works.

Read at publisher ↗
Where this section sits in the code
  1. Chs. 82-90, Highways and Bridges, Drains and Fences
  2. Chapter 87 Flood Control

Any 25 owners of lands which have been recurrently flooded by the waters of any designated stream, lake or pond or any tributaries thereof, or any public corporation within whose boundaries are located any lands subject to such overflow, may file with the department a written petition setting forth:

(1) The necessity for the construction of such works of improvement as will abate or substantially diminish the overflow of such lands, together with a statement that the construction of such works is required by the public health, safety, convenience or welfare;

(2) A general description of the purpose of the contemplated improvement and of the territory proposed to be benefited by the construction thereof. Said description need not be given by metes and bounds nor by legal or political subdivisions but shall be sufficient if it designate in general terms the territory proposed to be benefited by the improvement;

(3) A prayer for appropriate action and relief.

Collected 2026-09-05T12:00:41Z. Source file · JSON

Browse this collection