Wyo. Stat. § 16-6-707: Construction management alternate delivery method.
Where this section sits in the code
- TITLE 16 - CITY, COUNTY, STATE AND LOCAL POWERS
- CHAPTER 6 - PUBLIC PROPERTY
- ARTICLE 7 - CONSTRUCTION CONTRACTS WITH PUBLIC ENTITIES
(a) Excluding contracts for professional services, construction management and design-build delivery negotiations by public entities and construction managers shall be in accordance with residency and preference requirements imposed under W.S. 16-6-101 through 16-6-107.
(b) Formal requests for proposal for preconstruction or construction services by a construction manager or a design-builder submitted by a public entity shall require at least the following information:
(i) The location of the primary place of business;
(ii) The name and identification of individuals to be assigned to the project;
(iii) Experience with similar projects;
(iv) Qualifications;
(v) Ability to protect the interests of the public entity during the project;
(vi) Ability to meet project budget and time schedule requirements;
(vii) Excluding contracts for professional services, compliance with W.S. 16-6-101 through 16-6-107; and
(viii) For design-build alternative construction delivery methods, the names of the prime consultants used for architectural and engineering design services.
(c) Negotiations between a public entity and a construction manager at-risk shall require that the construction manager at-risk comply with the residency and preference requirements imposed under W.S. 16-6-101 through 16-6-107 in the procurement of subcontractors and materials.
Collected 2026-09-04T00:16:32Z. Source file · JSON