Wyo. Stat. § 29-4-101: Persons entitled to lien; extent thereof.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 29 - LIENS
  2. CHAPTER 4 - LABOR AND MATERIALS ON DITCHES, CANALS AND RESERVOIRS

(a) Any person who performs any work or furnishes any materials for the construction or improvement of any ditch, canal or reservoir under contract with the owner or his contractor or subcontractor, on complying with W.S. 29-2-101 through 29-2-109, is entitled to a lien for work done or material furnished upon the ditch, canal or reservoir. The lien covers:

(i) The right-of-way for the ditch, canal or reservoir;

(ii) The pertinent water permits and water rights; and

(iii) The reclaimed lands for which the ditch, canal or reservoir was constructed.