10 CFR 50.90: Application for amendment of license, construction permit, or early site permit.
Where this section sits in the code
- Title 10—Energy
- CHAPTER I—NUCLEAR REGULATORY COMMISSION
- PART 50—DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
Whenever a holder of a license, including a construction permit and operating license under this part, and an early site permit, combined license, and manufacturing license under part 52 of this chapter, desires to amend the license or permit, application for an amendment must be filed with the Commission, as specified in §§ 50.4 or 52.3 of this chapter, as applicable, fully describing the changes desired, and following as far as applicable, the form prescribed for original applications.
Collected 2026-08-27T02:24:09Z. Source file · JSON