GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

10 CFR 53.720: Response to seismic events.

Read at publisher ↗
Where this section sits in the code
  1. Title 10—Energy
  2. CHAPTER I—NUCLEAR REGULATORY COMMISSION
  3. PART 53—RISK-INFORMED, TECHNOLOGY-INCLUSIVE REGULATORY FRAMEWORK FOR COMMERCIAL NUCLEAR PLANTS
  4. Subpart F—Requirements for Operation

If vibratory ground motion exceeding that of the operating basis earthquake Ground Motion or significant plant damage due to vibratory ground motion occurs, the licensee must shut down the commercial nuclear plant. If structures, systems, or components necessary for the safe shutdown of the commercial nuclear plant are not available after the occurrence of this vibratory ground motion, the licensee must consult with the Commission and must propose a plan for the timely, safe shutdown of the commercial nuclear plant. Prior to resuming operations, the licensee must demonstrate to the Commission that those features necessary for continued operation without undue risk to the health and safety of the public or necessary to maintain the licensing basis of the commercial nuclear plant were either not functionally damaged or have been repaired.

Collected 2026-08-27T02:24:09Z. Source file · JSON

Browse this collection