GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

10 CFR 53.870: Integrity assessment programs.

Read at publisher ↗
Where this section sits in the code
  1. Title 10—Energy
  2. CHAPTER I—NUCLEAR REGULATORY COMMISSION
  3. PART 53—RISK-INFORMED, TECHNOLOGY-INCLUSIVE REGULATORY FRAMEWORK FOR COMMERCIAL NUCLEAR PLANTS
  4. Subpart F—Requirements for Operation

Each holder of an OL or COL under this part must develop, implement, and maintain an integrity assessment program to monitor, evaluate, and manage—

(a) The effects of plant aging on SR and NSRSS SSCs. The program may refer to surveillances, tests, and inspections conducted for specific SSCs in accordance with other requirements in this part or conducted in accordance with applicable consensus codes and standards endorsed or otherwise found acceptable by the NRC;

(b) Cyclic or transient load limits to ensure that SR and NSRSS SSCs are maintained within the applicable design limits; and

(c) Degradation mechanisms related to chemical interactions, operating temperatures, effects of irradiation, and other environmental factors to ensure that the capabilities, availability, and reliability of SR and NSRSS SSCs demonstrate compliance with the functional design criteria of §§ 53.410 and 53.420.

Collected 2026-08-27T02:24:09Z. Source file · JSON

Browse this collection