GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

10 CFR 960.5: Preclosure guidelines.

Read at publisher ↗
Where this section sits in the code
  1. Title 10—Energy
  2. CHAPTER III—DEPARTMENT OF ENERGY
  3. PART 960—GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY
  4. Subpart D—Preclosure Guidelines

The guidelines in this subpart specify the factors to be considered in evaluating and comparing sites on the basis of expected repository performance before closure. The preclosure guidelines are separated into three system guidelines and eleven technical guidelines.

Collected 2026-08-27T02:24:09Z. Source file · JSON

Browse this collection