GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

10 CFR 963.11: Suitability determination.

Read at publisher ↗
Where this section sits in the code
  1. Title 10—Energy
  2. CHAPTER III—DEPARTMENT OF ENERGY
  3. PART 963—YUCCA MOUNTAIN SITE SUITABILITY GUIDELINES
  4. Subpart B—Site Suitability Determination, Methods, and Criteria

DOE will evaluate whether the Yucca Mountain site is suitable for the location of a geologic repository on the basis of the preclosure and postclosure determinations described in §§ 963.12 and 963.15. If DOE's evaluation of the Yucca Mountain site for the location of a geologic repository under §§ 963.12 and 963.15 shows that the geologic repository is likely to meet the applicable radiation protection standards for the preclosure and postclosure periods, then DOE may determine that the site is a suitable location for the development of such a repository.

Collected 2026-08-27T02:24:09Z. Source file · JSON

Browse this collection