GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

10 CFR 963.15: Postclosure suitability determination.

Read at publisher ↗
Where this section sits in the code
  1. Title 10—Energy
  2. CHAPTER III—DEPARTMENT OF ENERGY
  3. PART 963—YUCCA MOUNTAIN SITE SUITABILITY GUIDELINES
  4. Subpart B—Site Suitability Determination, Methods, and Criteria

DOE will apply the method and criteria described in §§ 963.16 and 963.17 to evaluate the suitability of the Yucca Mountain site for the postclosure period. If DOE finds that the results of the total system performance assessments conducted under § 963.16 show that the Yucca Mountain site is likely to meet the applicable radiation protection standard, DOE may determine the site suitable for the postclosure period.

Collected 2026-08-27T02:24:09Z. Source file · JSON

Browse this collection