GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

14 CFR 33.73: Power or thrust response.

Read at publisher ↗
Where this section sits in the code
  1. Title 14—Aeronautics and Space
  2. CHAPTER I—FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
  3. SUBCHAPTER C—AIRCRAFT
  4. PART 33—AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES
  5. Subpart E—Design and Construction; Turbine Aircraft Engines

The design and construction of the engine must enable an increase—

(a) From minimum to rated takeoff power or thrust with the maximum bleed air and power extraction to be permitted in an aircraft, without overtemperature, surge, stall, or other detrimental factors occurring to the engine whenever the power control lever is moved from the minimum to the maximum position in not more than 1 second, except that the Administrator may allow additional time increments for different regimes of control operation requiring control scheduling; and

(b) From the fixed minimum flight idle power lever position when provided, or if not provided, from not more than 15 percent of the rated takeoff power or thrust available to 95 percent rated takeoff power or thrust in not over 5 seconds. The 5-second power or thrust response must occur from a stabilized static condition using only the bleed air and accessories loads necessary to run the engine. This takeoff rating is specified by the applicant and need not include thrust augmentation.

Collected 2026-08-27T02:24:20Z. Source file · JSON

Browse this collection