18 CFR 12.30: Applicability.
Where this section sits in the code
- Title 18—Conservation of Power and Water Resources
- CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY
- SUBCHAPTER B—REGULATIONS UNDER THE FEDERAL POWER ACT
- PART 12—SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS
- Subpart D—Review, Inspection, and Assessment by Independent Consultant
This subpart D applies to any licensed project development that:
(a) Has a dam
(1) That is more than 32.8 feet (10 meters) in height above streambed, as defined in § 12.31(c); or
(2) With an impoundment gross storage capacity of more than 2,000 acre-feet (2.5 million cubic meters), as defined in § 12.31(d);
(b) Has a project work (dam or water conveyance) or any portion thereof that has a high hazard potential, as defined in § 12.3(b)(13)(i); or
(c) Is determined by the Regional Engineer or other authorized Commission representative to require inspection by an independent consultant under this subpart D.